375.5 MW Batteries (71 MW) + Solar Photovoltaic (305 MW) planned in Haskell, TX — Electric Reliability Council of Texas, Inc.
375.5 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
33.1443, -99.5598
County
Haskell, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Briggs Solar, LLC | — | — |
| Owner(s) | Briggs Solar, LLC | — | — |
| Status | Planned | pre-construction | — |
Briggs Solar, LLC is a hybrid power plant located in Haskell County, Texas. The facility has a total capacity of 375.5 MW and is operated by Briggs Solar, LLC. It utilizes both solar photovoltaic technology and batteries for energy storage. The plant consists of two generators and employs a fixed tilt solar tracking system.
The plant's primary fuel source is listed as MWH, indicating it draws power from the grid to charge its batteries, in addition to solar generation. Briggs Solar operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority, and is part of the Texas Reliability Entity (TRE) NERC region. It is ranked as the 34th largest power plant in Texas out of 224, and 109th nationally out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $579.4M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-14
View all articlesElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP