Search plants, projects, owners, and states
9.9 MW BESS operating in Eastland, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
32.3915, -98.9782
County
Eastland, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HEN Infrastructure, L.L.C. | Hunt Energy Network | — |
| Owner(s) | Hunt Energy Network, LLC, John Hancock Funding Company, Manulife Infrastructure II Holdings A, L.P. | Hunt Energy | — |
| Status | Operating | — | — |
CISCO BESS is a 9.9 MW battery energy storage system located in Eastland County, Texas. The plant began operating in 2024 and utilizes lithium-ion batteries (LIB) to provide 9.9 MWh of energy storage with a duration of 1 hour. The primary fuel type is listed as "MWH", indicating that it draws power from the grid to charge the batteries.
The facility is owned by Hunt Energy and operated by HEN Infrastructure, L.L.C. CISCO BESS operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is located within the Texas Reliability Entity (TRE) NERC region. In terms of size, the plant is ranked 296th out of 313 power plants in Texas, and 834th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
−22 MWh
Net Charging
-128 MWh
Annual Net Energy
-0.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $13.5M
Market Position
ISO/RTO Market
ERCOT
LMP Node
CISC_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about CISCO BESSElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP