201.6 MW Wind operating in White, IN — Midcontinent Independent Transmission System Operator, Inc..
201.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
Coordinates
40.7794, -87.0421
County
White, IN
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Indiana Crossroads Wind Farm II LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Owner(s) | Indiana Crossroads Wind Farm II LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
This entity is not yet in the GEM ownership database — chain unavailable.
Indiana Crossroads Wind Farm II is a 201.6 MW wind power plant located in White County, Indiana. The facility began operating in 2024 and is owned and operated by Indiana Crossroads Wind Farm II LLC. It ranks as the fourth-largest wind farm in Indiana (out of 23) and 272nd-largest nationally (out of 734). The plant consists of a single generator utilizing onshore wind turbine technology.
The wind farm uses Nordex N155/4.8 turbines, characterized by a 155-meter rotor diameter and a hub height of 105 meters. In its most recent year of operation, the plant generated 592,538 MWh of electricity, achieving a capacity factor of 33.6%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
66.6K MWh
Latest Month
592.5K MWh
Annual Generation
33.6%
Capacity Factor
2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $354.4M
Market Position
ISO/RTO Market
MISO
LMP Node
NIPS.CARPNTRWF
Pricing Hub
INDIANA.HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-04-19