Search plants, projects, owners, and states
147.5 MW Batteries (50 MW) + Solar Photovoltaic (98 MW) testing in Hill, TX — Electric Reliability Council of Texas, Inc.
147.5 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
32.1160, -97.3435
County
Hill, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sunraycer Assets I LLC | Sunraycer Renewables LLC | — |
| Owner(s) | Sunraycer Assets I LLC | Sunraycer Renewables LLC | — |
| Status | Testing | construction | — |
GEM identifies the owner as Sunraycer Renewables LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Midpoint Solar, LLC, located in Hill County, Texas, is a 147.5 MW hybrid power plant utilizing both solar photovoltaic and battery storage technologies. The plant, identified by plant ID 66897, is operated by Sunraycer Assets I LLC. It consists of two generators and uses fixed-tilt solar tracking.
The plant's primary fuel source is listed as MWH (megawatt-hours), reflecting its solar-powered generation. Midpoint Solar operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It is ranked as the 174th largest power plant in Texas out of 224, and nationally it is ranked 407th out of 514. Recent news coverage indicates significant activity in deals related to the plant, with 8 articles focusing on deals and 2 on general industry news.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $200.7M
Market Position
ISO/RTO Market
ERCOT
LMP Node
MIDP_SLR_RN
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Midpoint Solar, LLCElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP