300 MW BESS planned in Nassau, NY — New York Independent System Operator
300 MW
Nameplate Capacity
2
Generators
units
Batteries
Technology
Planned: —
Planned Operation
Coordinates
40.6197, -73.6502
County
Nassau, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hecate Grid Intrepid 1 LLC | — | — |
| Owner(s) | Hecate Grid Intrepid 1 LLC | — | — |
| Status | Planned | — | — |
Hecate Grid Intrepid is a 300 MW battery energy storage system located in Nassau County, New York. The plant is owned and operated by Hecate Grid Intrepid 1 LLC. It consists of two generators utilizing batteries as their energy source.
The facility operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Hecate Grid Intrepid is ranked as the second-largest battery storage facility in New York State out of six such plants, and it holds the 148th position nationally among 514 battery storage facilities.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $408.3M
Point of Interconnection
Nearest Substation
BARRETT_IC_1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone K
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Hecate Grid IntrepidNew York Independent System Operator (NYIS)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP