Search plants, projects, owners, and states
4 MW Solar operating in Tarrant, TX — Electric Reliability Council of Texas, Inc.
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC | — | — |
| Owner(s) | Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC | — | — |
| Status | Operating | operating | — |
The TX Fort Worth 5200 Gold Spike Drive power plant is a 4 MW solar photovoltaic facility located in Tarrant County, Texas. The plant began operating in 2025 and is owned and operated by Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC. The facility utilizes fixed-tilt solar tracking technology.
The plant connects to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. In terms of size, the plant is ranked 272 out of 298 power plants in Texas, and 3506 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $6.2M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about TX Fort Worth 5200 Gold Spike DriveElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
4.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP