73 MW Solar planned in Johnston, NC — Duke Energy Carolinas
73 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
27.9763, -81.5949
County
Johnston, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Capital Power Corporation | Capital Power Corp | — |
| Owner(s) | Capital Power Corporation | Capital Power Corp | — |
| Status | Planned | pre-construction | — |
Maple Leaf Solar is a 73 MW solar photovoltaic power plant located in Johnston County, North Carolina. The plant, which utilizes fixed-tilt solar tracking technology, is owned and operated by Capital Power Corporation. It is the 26th largest solar facility in North Carolina out of 770, and ranks 991st nationally out of 7108 solar plants. The plant's primary fuel source is solar energy (SUN).
The facility is located within the Duke Energy Carolinas balancing authority and the SERC NERC region. As of the latest available data, Maple Leaf Solar consists of a single generator. News reports related to the plant have focused on industry developments.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
No generation data available for this plant.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $112.6M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Maple Leaf SolarDuke Energy Carolinas (DUK)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP