Search plants, projects, owners, and states
1 MW Solar operating in Auglaize, OH — PJM Interconnection, LLC
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
40.3900, -84.3980
County
Auglaize, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Energy Investments LLC | — | — |
| Owner(s) | Madison Energy Investments LLC | — | — |
| Status | Operating | operating | — |
Minster 3 is a 1 MW solar photovoltaic power plant located in Auglaize County, Ohio. The plant began operating in 2022 and has a single generator. Madison Energy Investments LLC is the owner and operator. The plant utilizes a fixed tilt solar tracking system.
Minster 3 operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. In its latest year of operation, the plant generated 1,665 MWh of electricity, achieving a capacity factor of 19.0%. In terms of size, Minster 3 ranks as the 83rd largest solar plant in Ohio out of 84, and 6441st nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
59 MWh
Latest Month
1.7K MWh
Annual Generation
19.0%
Capacity Factor
Data from 2023–2024
$37.6/MWh
Energy Value
$2.9/MWh
Capacity Value
Market Position
ISO/RTO Market
PJM
LMP Node
09AMSTRD69 KV BK-1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Minster 3PJM Interconnection, LLC (PJM)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP