Search plants, projects, owners, and states
1.8 MW Solar operating in Union, AR — Midcontinent Independent Transmission System Operator, Inc..
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
33.2129, -92.6215
County
Union, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entegrity Solar El Dorado SD, LLC | — | — |
| Owner(s) | Entegrity Solar El Dorado SD, LLC | — | — |
| Status | Operating | operating | — |
El Dorado AR is a solar photovoltaic power plant located in Union County, Arkansas. The plant, owned and operated by Entegrity Solar El Dorado SD, LLC, has a total capacity of 1.8 MW. It commenced operations in 2024 and consists of a single generator utilizing single-axis solar tracking technology.
The plant's latest annual generation was 1,582 MWh, resulting in a capacity factor of 10.0%. El Dorado AR operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In terms of size, the plant is ranked 51 out of 77 power plants in Arkansas and 5491 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
113 MWh
Latest Month
1.6K MWh
Annual Generation
10.0%
Capacity Factor
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $2.8M
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about El Dorado ARMidcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
35.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP