Search plants, projects, owners, and states
185.6 MW BESS planned in Maverick, TX — Electric Reliability Council of Texas, Inc.
185.6 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
28.8379, -100.5487
County
Maverick, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RIC Development, LLC | — | — |
| Owner(s) | RIC Development, LLC | — | — |
| Status | Planned | — | — |
Serrano BESS is a battery energy storage system located in Maverick County, Texas. The plant has a total capacity of 185.6 MW and consists of a single generator. It is owned and operated by RIC Development, LLC. The primary fuel type is listed as MWH, indicating that it draws power from the grid to charge its batteries.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Serrano BESS ranks as the 137th largest power plant in Texas out of 224, and 335th nationally out of 514 plants. Public records indicate 3 news articles related to the plant, including 2 related to deals and 1 related to industry news.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $252.6M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Serrano BESSElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP