200 MW BESS planned in Tarrant, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | — | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Planned | — | — |
Fort Watt Storage, located in Tarrant County, Texas, is a 200 MW battery energy storage system. The plant is owned and operated by Cypress Creek Renewables. It interconnects to the Electric Reliability Council of Texas (ERCOT) balancing authority, within the Texas Reliability Entity (TRE) NERC region.
The facility consists of a single generator utilizing battery storage technology and has a primary fuel source of electricity (MWH). Fort Watt Storage ranks as the 121st largest power plant in Texas out of 224, and 301st nationally out of 514 facilities.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $272.2M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-26
View all articlesElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP