Search plants, projects, owners, and states
50.9 MW BESS planned in Franklin, TX — Electric Reliability Council of Texas, Inc.
50.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
33.3015, -95.2548
County
Franklin, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sunraycer Assets I LLC | — | — |
| Owner(s) | Sunraycer Assets I LLC | — | — |
| Status | Planned | — | — |
Lupinus Storage 3 is a 50.9 MW battery energy storage system located in Franklin County, Texas. The plant's primary fuel is electricity (MWH), which it uses to charge its batteries. It consists of a single generator. Sunraycer Assets I LLC is the owner and operator.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. Lupinus Storage 3 ranks as the 230th largest power plant in Texas out of 313, and nationally it ranks 601st out of 1205.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $69.3M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-26
View all 7 articlesNo ask pi reports yet for this entity.
ask pi about Lupinus Storage 3Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP