1.5 MW Solar operating in El Paso, TX — El Paso Electric Company
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
31.8077, -106.3378
County
El Paso, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SoCore Energy LLC | — | — |
| Owner(s) | SoCore Energy LLC | — | — |
| Status | Operating | operating | — |
TJX 2021 DG El Paso DC is a solar photovoltaic power plant located in El Paso County, Texas. The plant has a total capacity of 1.5 MW and consists of a single generator. It began operating in 2024 and is owned and operated by SoCore Energy LLC. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's primary fuel source is solar energy. It operates within the El Paso Electric Company balancing authority and the TRE NERC region. In terms of size, TJX 2021 DG El Paso DC ranks as the 287th largest solar plant in Texas out of 298, and 5799th nationally out of 7108.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $2.3M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about TJX 2021 DG El Paso DCEl Paso Electric Company (EPE)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP