3 MW Solar operating in San Luis Obispo, CA — California Independent System Operator
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.6794, -120.6359
County
San Luis Obispo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Onyx Asset Services Group | Onyx Asset Services Group | — |
| Owner(s) | Onyx Asset Services Group | Onyx Asset Services Group | — |
| Status | Operating | operating | — |
GEM identifies the owner as Onyx Asset Services Group
This entity is not yet in the GEM ownership database — chain unavailable.
The Paso Robles - Municipal Airport solar photovoltaic plant is located in San Luis Obispo County, California. The plant has a total capacity of 3 MW and consists of a single generator. It began operating in 2024 and is operated by Onyx Asset Services Group. The plant utilizes single-axis tracking to maximize solar energy capture.
The Paso Robles - Municipal Airport plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, the plant generated 5,961 MWh of electricity, achieving a capacity factor of 22.6%. The plant ranks 384th out of 862 solar plants in California and 3905th out of 7108 solar plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
296 MWh
Latest Month
6.0K MWh
Annual Generation
22.6%
Capacity Factor
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Point of Interconnection
Nearest Substation
Paso Robles · 12 kV
Substation Distance
< 10 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Paso Robles - Municipal AirportCalifornia Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP