Search plants, projects, owners, and states
2 MW Solar operating in Aroostook, ME — ISO New England Inc.
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
42.8627, -77.0328
County
Aroostook, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | REA Investments, LLC | — | — |
| Owner(s) | REA Investments, LLC | — | — |
| Status | Operating | operating | — |
Houlton Road Solar Farm (CSG) is a 2 MW solar photovoltaic power plant located in Aroostook County, Maine. The plant began operating in 2024 and has one generator. It is owned and operated by REA Investments, LLC. The facility utilizes a fixed tilt solar tracking system.
The plant's primary fuel source is solar energy. Houlton Road Solar Farm operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant is ranked 135th out of 153 power plants in the state of Maine, and 5059th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $5.2M
Point of Interconnection
Nearest Substation
Reenergy Fort Fairfield
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Houlton Road Solar Farm (CSG)ISO New England Inc. (ISNE)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP