Search plants, projects, owners, and states
350 MW Solar testing in Bell, TX — Electric Reliability Council of Texas, Inc.
350 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
31.0060, -97.2620
County
Bell, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Chillingham Solar LLC | — | — |
| Owner(s) | Chillingham Solar LLC | — | — |
| Status | Testing | operating | — |
Chillingham Solar is a 350 MW solar photovoltaic power plant located in Bell County, Texas. The plant, which utilizes fixed-tilt solar tracking technology, is operated by Chillingham Solar LLC. It is the 31st largest solar plant in Texas out of 192, and ranks 53rd nationally out of 639 solar facilities. The plant has one generator.
Chillingham Solar operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. Financial data is available for the plant from LBNL, though specific figures are not provided in this dataset.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
Data from 2024
$31.4/MWh
LCOE
Point of Interconnection
Nearest Substation
East Bell County Substation · 345 kV
Substation Distance
0.779 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CHIL_SLR
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.