Search plants, projects, owners, and states
176.1 MW BESS planned in Hunt, TX — Electric Reliability Council of Texas, Inc.
176.1 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
33.1797, -95.8092
County
Hunt, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | — | — |
Mcmurtre Storage is a 176.1 MW battery energy storage system located in Hunt County, Texas. The plant is owned and operated by Belltown Power Texas 2, LLC. The primary fuel source is electricity (MWH), indicating that the facility stores and discharges power rather than generating it directly from a fuel source. The plant consists of a single generator utilizing battery technology.
Mcmurtre Storage operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which manages the flow of electricity throughout most of the state. ERCOT is part of the Texas Reliability Entity (TRE) within the North American Electric Reliability Corporation (NERC) regional structure. In terms of size, Mcmurtre Storage is ranked as the 142nd largest power plant in Texas out of 224 facilities, and 345th nationally out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $239.7M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Mcmurtre StorageElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP