Search plants, projects, owners, and states
227.1 MW Batteries (101 MW) + Solar Photovoltaic (126 MW) planned in Wise, TX — Electric Reliability Council of Texas, Inc.
227.1 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
33.3073, -97.5278
County
Wise, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | pre-construction | — |
Sandford Solar and Storage is a hybrid power plant located in Wise County, Texas. The facility has a total capacity of 227.1 MW and is operated by Belltown Power Texas 2, LLC. The plant utilizes both solar photovoltaic technology and battery storage, with its primary fuel source listed as electricity (MWH). It consists of two generators.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Sandford Solar and Storage is ranked as the 80th largest power plant in Texas out of 224, and nationally it is ranked 234 out of 514. The solar photovoltaic component of the plant uses a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $309.1M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Top 10 solar states