Search plants, projects, owners, and states
401.4 MW Solar operating in Eastland, TX — Electric Reliability Council of Texas, Inc.
401.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
32.4382, -99.1577
County
Eastland, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sequoia 1 Solar Project | — | — |
| Owner(s) | Sequoia 1 Solar Project | — | — |
| Status | Operating | construction | — |
Sequoia 1 is a 401.4 MW solar photovoltaic power plant located in Eastland County, Texas. The plant, identified by the EIA plant code 68200, is owned and operated by Sequoia 1 Solar Project. It utilizes fixed-tilt solar tracking technology. The facility consists of a single generator and is fueled by solar energy.
Sequoia 1 operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It ranks as the 20th largest solar plant in Texas out of 192, and nationally it holds the 39th position among 639 solar facilities.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
21.1K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $619.4M
Market Position
ISO/RTO Market
ERCOT
LMP Node
DORA_SLR_RN
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.