130 MW Solar under construction in Grant, WA — Public Utility District No. 2 of Grant County, Washington
130 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SR Quincy Valley, LLC | — | — |
| Owner(s) | SR Quincy Valley, LLC | — | — |
| Status | Under construction | pre-construction | — |
SR Quincy Valley is a 130 MW solar photovoltaic power plant located in Grant County, Washington. The plant is owned and operated by SR Quincy Valley, LLC. It utilizes fixed-tilt solar tracking technology. The plant is the third-largest solar facility in Washington state, and ranks 460th nationally out of 639 solar plants.
The plant consists of a single generator. It operates within the Western Electricity Coordinating Council (WECC) NERC region, and its balancing authority is the Public Utility District No. 2 of Grant County, Washington. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
No generation data available for this plant.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $200.7M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about SR Quincy ValleyPublic Utility District No. 2 of Grant County, Washington (GCPD)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP