1.3 MW Solar under construction in Ventura, CA — California Independent System Operator
1.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
34.2034, -119.1394
County
Ventura, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Camino del Sol 2 Solar Project 2022, LLC | — | — |
| Owner(s) | Camino del Sol 2 Solar Project 2022, LLC | — | — |
| Status | Under construction | construction | — |
Bayer Oxnard - Meter# 4719 is a 1.3 MW solar photovoltaic power plant located in Ventura County, California. The plant is owned and operated by Camino del Sol 2 Solar Project 2022, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Based on its total capacity, Bayer Oxnard - Meter# 4719 ranks as the 687th largest solar plant in California out of 862, and 6071st nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
No generation data available for this plant.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $2.0M
Market Position
ISO/RTO Market
CAISO
LMP Node
CHARMNGN_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Bayer Oxnard - Meter# 4719California Independent System Operator (CISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP