150 MW BESS under construction in Pecos, TX — Electric Reliability Council of Texas, Inc.
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
30.9161, -102.8553
County
Pecos, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lydian Energy | — | — |
| Owner(s) | Lydian Energy | — | — |
| Status | Under construction | — | — |
Headcamp BESS is a 150 MW battery energy storage system located in Pecos County, Texas. The plant, identified by the EIA plant code 68580, is operated by Lydian Energy. It consists of a single generator and utilizes MWH as its primary fuel source, indicating it draws power from the grid to charge its batteries. The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region.
Headcamp BESS ranks as the 171st largest power plant in Texas out of 224 facilities and holds the 402nd position nationally out of 514 plants. Recent news articles indicate activity related to deals involving the plant.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $204.2M
Point of Interconnection
Nearest Substation
16th Street Substation · 138 kV
Substation Distance
0.223 km
Operator
Texas-New Mexico Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
DGFS_ESR_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Headcamp BESSElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP