Search plants, projects, owners, and states
100 MW Solar operating in Ector, TX — Electric Reliability Council of Texas, Inc.
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
31.7231, -102.5196
County
Ector, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Origis Energy USA, Inc | Origis Energy USA Inc | — |
| Owner(s) | Origis Energy USA, Inc | Origis Energy USA Inc | — |
| Status | Operating | operating | — |
GEM identifies the owner as Origis Energy USA Inc
This entity is not yet in the GEM ownership database — chain unavailable.
Swift Air Solar II is a 100 MW solar photovoltaic power plant located in Ector County, Texas. The plant's primary fuel source is solar energy. It consists of a single generator utilizing fixed-tilt solar tracking technology. Origis Energy USA, Inc. operates the facility.
The plant is located within the Electric Reliability Council of Texas (ERCOT) balancing authority. According to state rankings, Swift Air Solar II is the 184th largest power plant in Texas out of 192, and nationally it ranks 612 out of 639 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
19.6K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $154.3M
Point of Interconnection
Nearest Substation
Southwestern Portland Substation · 138 kV
Substation Distance
2.569 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
GRYH_SLR_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Swift Air Solar IIElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP