143 MW BESS planned in Taylor, TX — Electric Reliability Council of Texas, Inc.
143 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
32.5129, -99.7956
County
Taylor, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RIC Development, LLC | — | — |
| Owner(s) | RIC Development, LLC | — | — |
| Status | Planned | — | — |
Summerhill BESS is a battery energy storage system located in Taylor County, Texas. The plant has a total capacity of 143 MW and consists of a single generator. It is owned and operated by RIC Development, LLC. The primary fuel type is listed as MWH, indicating that it draws power from the grid to charge its batteries.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which manages the flow of electricity in most of the state. Summerhill BESS is ranked as the 175th largest power plant in Texas out of 224, and 409th nationally out of 514. The plant falls within the Texas Reliability Entity (TRE) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $194.6M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Summerhill BESSElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP