Search plants, projects, owners, and states
9.9 MW BESS operating in Hidalgo, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
Coordinates
26.3224, -98.3523
County
Hidalgo, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Prologis Logistics Services Incorporated BESS | — | — |
| Owner(s) | Prologis Logistics Services Incorporated BESS | — | — |
| Status | Operating | — | — |
Citrus City BESS is a 9.9 MW battery energy storage system located in Hidalgo County, Texas. The facility began operating in 2025 and is owned and operated by Prologis Logistics Services Incorporated BESS. It consists of a single generator utilizing battery technology with a storage duration of approximately 2.49 hours. The plant's primary fuel is electricity (MWH), indicating it charges from the grid and discharges when needed.
Citrus City BESS operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, serving the Texas Regional Entity (TRE) NERC region. In terms of size, the plant is ranked 286th out of 313 power plants in Texas and 824th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $13.5M
Point of Interconnection
Nearest Substation
Citrus City Substation · 138 kV
Substation Distance
0.055 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CITRUSCY_RN
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Citrus City BESSElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP