Search plants, projects, owners, and states
2 MW Solar operating in Peoria, IL — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
40.6222, -89.6788
County
Peoria, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SolAmerica Energy, LLC | — | — |
| Owner(s) | SolAmerica Energy, LLC | — | — |
| Status | Operating | operating | — |
Peoria County IL S2 is a 2 MW solar photovoltaic power plant located in Peoria County, Illinois. The plant, which began operating in 2025, utilizes a fixed-tilt solar tracking system. It consists of a single generator and is operated by SolAmerica Energy, LLC.
The plant's output is integrated into the grid managed by the Midcontinent Independent Transmission System Operator, Inc. (MISO), a balancing authority within the SERC Reliability Corporation (SERC) NERC region. In terms of size, Peoria County IL S2 is ranked as the 134th largest solar plant in Illinois out of 320, and 4818th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
No generation data available for this plant.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.EDWARDS3
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Peoria County IL S2Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP