216.3 MW Landfill Gas (5 MW) + Natural Gas Fired Combined Cycle (149 MW) + Natural Gas Fired Combustion Turbine (61 MW) + Petroleum Liquids (2 MW) operating in Lancaster, NE — Southwest Power Pool
216.3 MW
Nameplate Capacity
8
Generators
units
Hybrid (4)
Technology
Landfill Gas + Natural Gas Fired Combined Cycle + Natural Gas Fired Combustion Turbine + Petroleum Liquids
2003
Operating Since
Coordinates
40.9097, -96.6130
County
Lancaster, NE
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lincoln Electric System | Lincoln Electric System | — |
| Owner(s) | Lincoln Electric System | Lincoln Electric System | — |
| Status | Operating | — | — |
The Terry Bundy Generating Station is a 216.3 MW hybrid power plant located in Lancaster County, Nebraska. It began operating in 2003 and is owned and operated by Lincoln Electric System. The plant utilizes a mix of fuel sources, primarily natural gas, and employs multiple technologies including landfill gas, natural gas fired combined cycle, natural gas fired combustion turbine, and petroleum liquids. The facility consists of 8 generators.
The Terry Bundy Generating Station operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In the most recent year of data, the plant generated 136,016 MWh of electricity, achieving a capacity factor of 7.2%. Terry Bundy ranks as the 7th largest power plant out of 10 in Nebraska, and 736th out of 945 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
5.6K MWh
Latest Month
136.0K MWh
Annual Generation
7.2%
Capacity Factor
CO₂ Intensity
462 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
4.7%
Annual Net Gen
89 GWh
CO₂eq
463 lb/MWh
Subregion
MRO West
2013
$965/kW
Est. Construction Cost
Total estimated cost: $208.8M
Market Position
ISO/RTO Market
SPP
LMP Node
LES84_BLUFPLT1
Pricing Hub
SPP North Hub
Node Source
EIA-860 direct report
Last updated 2026-03-26