47 MW Natural Gas operating in Suffolk, NY — New York Independent System Operator
47 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
Coordinates
40.7871, -73.2937
County
Suffolk, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New York Power Authority | New York Power Authority | — |
| Owner(s) | New York Power Authority | New York Power Authority | — |
| Status | Operating | — | — |
The Brentwood power plant is a 47 MW natural gas-fired combustion turbine facility located in Suffolk County, New York. It began operating in 2001 and is owned and operated by the New York Power Authority. The plant is connected to the New York Independent System Operator (NYISO) balancing authority and resides within the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Brentwood generated 37,447 MWh of electricity, resulting in a capacity factor of 9.0%. The plant ranks 57th out of 102 power plants in New York state and 1139th out of 1963 plants nationally. The facility consists of a single generator.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
4.0K MWh
Latest Month
37.4K MWh
Annual Generation
9.0%
Capacity Factor
CO₂ Intensity
1290 lb/MWh
NOx
0.112 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.024 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
8.6%
Annual Net Gen
36 GWh
CO₂eq
1291 lb/MWh
Subregion
NPCC Long Island
2013
$965/kW
Est. Construction Cost
Total estimated cost: $45.4M
Point of Interconnection
Nearest Substation
NYPA_BRENTWD_____GT
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone K
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26