200 MW generation in Vernon, MO · In queue since December 2024 · Proposed COD December 2028
200 MW
Capacity
1
Components
Solar
1y 5m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
4 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
AEC-GI-124 is a proposed solar generation project with a total capacity of 200 MW. The project is located in Vernon County, Missouri, within the Southeast region, and is being developed by Associated Electric Cooperative, Incorporated (AEC). It entered the AEC generation interconnection queue on December 9, 2024, with a proposed commercial operation date of December 31, 2028.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Camp Clark 161 kV substation.
Generated from interconnection queue and public data sources
State
MO
County
Vernon
Grid Region
Southeast
Market
—
Developer
—
Utility
Associated Electric Cooperative, Incorporated
Entity
AEC
Service Type
—
Point of Interconnection
Camp Clark 161 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- AECI
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project AEC-GI-124