AEC-GI-42
1.7 MW generation in Randolph, MO · In queue since November 2009 · Proposed COD May 2010
1.7 MW
Capacity
1
Components
Coal
16y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2010
Total Duration
6 months
Schedule
195 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2010-05-01
AEC-GI-42 is a proposed 1.7 MW coal-fired generation project located in Randolph County, Missouri. The project is being developed by Associated Electric Cooperative, Incorporated (AEC). It is listed as active in the Associated Electric Cooperative (AEC) Generation Interconnection queue, with an entry date of November 4, 2009.
The proposed commercial operation date (COD) for AEC-GI-42 is May 1, 2010. Its interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the TH Switchyard (161 kV Bus).
Generated from interconnection queue and public data sources
State
MO
County
Randolph
Grid Region
Southeast
Market
—
Developer
—
Utility
Associated Electric Cooperative, Incorporated
Entity
AEC
Service Type
—
Point of Interconnection
TH Switchyard (161 kV Bus)
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- AECI
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project AEC-GI-42