AEC-GI-48
33 MW generation in Randolph, MO · In queue since October 2012 · Proposed COD May 2012
33 MW
Capacity
1
Components
Coal
13y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2012
Total Duration
13y 7m
Schedule
171 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2012-05-01
AEC-GI-48 is a proposed 33 MW coal-fired generation project located in Randolph County, Missouri. The developer is Associated Electric Cooperative, Incorporated (AEC). This project is listed in the Associated Electric Cooperative (AEC) interconnection queue with an entry date of October 8, 2012. The proposed commercial operation date is May 1, 2012. Its interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project consists of 33 MW of coal generation. The point of interconnection is the TH Switchyard (345 kV Bus).
Generated from interconnection queue and public data sources
State
MO
County
Randolph
Grid Region
Southeast
Market
—
Developer
—
Utility
Associated Electric Cooperative, Incorporated
Entity
AEC
Service Type
—
Point of Interconnection
TH Switchyard (345 kV Bus)
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- AECI
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project AEC-GI-48