Project APS-Q311 — Project Summary

Queue ID
APS-Q311
Capacity
500 MW
Technology
Wind+Battery
Status
active
Location
Navajo, AZ
Region
West
Developer
IA Status
In Progress (unknown study)

APS-Q311

APS-Q311BetaActiveWindBatteryAPSLBNL

500 MW hybrid in Navajo, AZ · In queue since September 2019 · Proposed COD December 2021

500 MW

Capacity

1

Components

Wind

6y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2021

Interconnection

Total Duration

2y 3m

Schedule

53 months past proposed COD

In Study38%
Queue EntrySep 26, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-12-31

About

APS-Q311 is a proposed 500 MW hybrid wind and battery project located in Navajo County, Arizona. The project, which appeared in the Arizona Public Service (APS) interconnection queue on September 26, 2019, consists of 500 MW of wind generation capacity. The proposed commercial operation date is December 31, 2021.

The project's interconnection to the grid at the Sitgreaves substation is currently listed as "In Progress (unknown study)". The utility is Arizona Public Service (APS).

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Navajo

Grid Region

Mountain West

Market

Developer

Utility

Arizona Public Service

Entity

APS

Service Type

Point of Interconnection

Sitgreaves substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.