APS-Q370
309.7 MW generation in Coconino, AZ · In queue since March 2021 · Proposed COD December 2024
309.7 MW
Capacity
1
Components
Wind
5y 2m
In Queue
Cluster Study
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-15
APS-Q370 is a proposed wind generation project with a total capacity of 309.7 MW, located in Coconino County, Arizona. The project is listed in the Arizona Public Service (APS) interconnection queue, with a queue entry date of March 30, 2021, and a proposed commercial operation date of December 15, 2024. Its interconnection status is currently in the Cluster Study phase.
The point of interconnection for the project is the Moenkopi-Cedar Mtn 500 kV line. The developer is listed as APS.
Generated from interconnection queue and public data sources
State
AZ
County
Coconino
Grid Region
Mountain West
Market
—
Developer
—
Utility
Arizona Public Service
Entity
APS
Service Type
—
Point of Interconnection
Moenkopi-Cedar Mtn 500 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project APS-Q370