Project APS-Q525 — Project Summary

Queue ID
APS-Q525
Capacity
300 MW
Technology
Wind
Status
active
Location
Mohave, AZ
Region
West
Developer
IA Status
Cluster Study

APS-Q525

APS-Q525BetaActiveWindAPSLBNL

300 MW generation in Mohave, AZ · In queue since March 2023 · Proposed COD December 2027

300 MW

Capacity

1

Components

Wind

3y 2m

In Queue

Cluster Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 9m

Impact Study25%
Queue EntryMar 31, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

APS-Q525 is a proposed 300 MW wind generation project located in Mohave County, Arizona. The project is being developed within the Arizona Public Service (APS) service territory. It consists of 300 MW of wind capacity.

The project is listed in the Arizona Public Service interconnection queue as of March 31, 2023, with a proposed commercial operation date of December 31, 2027. Its interconnection status is currently in the Cluster Study phase, and the point of interconnection is the Moenkopi - El Dorado 500kV Line. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Mohave

Grid Region

Mountain West

Market

Developer

Utility

Arizona Public Service

Entity

APS

Service Type

Point of Interconnection

Moenkopi - El Dorado 500kV Line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.