Project APS-Q549 — Project Summary

Queue ID
APS-Q549
Capacity
42.12 MW
Technology
Other
Status
active
Location
Maricopa, AZ
Region
West
Developer
IA Status
Cluster Study

APS-Q549

APS-Q549BetaActiveDieselAPSLBNL

42.12 MW generation in Maricopa, AZ · In queue since April 2024 · Proposed COD June 2026

42.12 MW

Capacity

1

Components

Diesel

2y 1m

In Queue

Cluster Study

IA Status

COD target: 2026

Interconnection

Total Duration

2y 2m

Impact Study25%
Queue EntryApr 12, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-01

About

APS-Q549 is a proposed 42.12 MW diesel-fueled generation project located in Maricopa County, Arizona. The project is being developed within the Arizona Public Service (APS) service territory. It entered the APS interconnection queue on April 12, 2024, with a proposed commercial operation date of June 1, 2026. The interconnection point is planned from the TSMC Fab 2 switchgear to the Avery substation.

The project's interconnection status is currently in the Cluster Study phase. The developer is listed as APS.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

Developer

Utility

Arizona Public Service

Entity

APS

Service Type

Point of Interconnection

TSMC Fab 2 switchgear to Avery substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.