Project APS-Q550 — Project Summary

Queue ID
APS-Q550
Capacity
43.04 MW
Technology
Gas
Status
active
Location
Maricopa, AZ
Region
West
Developer
IA Status
Cluster Study

APS-Q550

APS-Q550BetaActiveGasAPSLBNL

43.04 MW generation in Maricopa, AZ · In queue since April 2024 · Proposed COD April 2028

43.04 MW

Capacity

1

Components

Gas

2y 1m

In Queue

Cluster Study

IA Status

COD target: 2028

Interconnection

Total Duration

4 years

Impact Study25%
Queue EntryApr 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

About

APS-Q550 is a proposed generation project located in Maricopa County, Arizona, with a total capacity of 43.04 MW. The project, developed by Arizona Public Service (APS), utilizes gas-fired technology. It is currently in the Arizona Public Service interconnection queue (APS-Q) as of April 27, 2024, with a proposed commercial operation date of April 1, 2028. The interconnection status is currently in the Cluster Study phase, and the point of interconnection (POI) is the Redhawk 500kV Switchyard.

The project consists of a single 43.04 MW gas-fired component.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

Developer

Utility

Arizona Public Service

Entity

APS

Service Type

Point of Interconnection

Redhawk 500kV Switchyard

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.