APS-Q559
80 MW generation in Maricopa, AZ · In queue since May 2024 · Proposed COD March 2028
80 MW
Capacity
1
Components
Solar
2 years
In Queue
Cluster Study
IA Status
COD target: 2028
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
APS-Q559 is a proposed solar generation project located in Maricopa County, Arizona, with a total capacity of 80 MW. The project is listed in the Arizona Public Service (APS) interconnection queue, with an entry date of May 9, 2024. The proposed commercial operation date is March 31, 2028.
The project's interconnection status is currently in the Cluster Study phase. The point of interconnection (POI) is the 230KV PANDA SUBSTATION, located at coordinates 32.973169, -112.690040. The developer is listed as APS. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
AZ
County
Maricopa
Grid Region
Mountain West
Market
—
Developer
—
Utility
Arizona Public Service
Entity
APS
Service Type
—
Point of Interconnection
230KV PANDA SUBSTATION ( 32.973169 , -112.690040)
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.