Project Avista-CS24-07 — Project Summary

Queue ID
Avista-CS24-07
Capacity
2 MW
Technology
Solar
Status
active
Location
Adams, WA
Region
West
Developer
IA Status
Facility Study

Avista-CS24-07

Avista-CS24-07BetaActiveSolarAvistaLBNL

2 MW generation in Adams, WA · In queue since April 2024 · Proposed COD December 2024

2 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Status

COD target: 2024

Interconnection

Total Duration

8 months

Schedule

17 months past proposed COD

Facilities Study50%
Queue EntryApr 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-10

About

Avista-CS24-07 is a proposed solar generation project located in Adams County, Washington, with a total capacity of 2 MW. The project is listed in the Avista Utilities interconnection queue with an entry date of April 29, 2024. Its proposed commercial operation date is December 10, 2024.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Othello 13kV substation.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Adams

Grid Region

Mountain West

Market

Developer

Utility

Avista Utilities

Entity

Avista

Service Type

Point of Interconnection

Othello 13kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.