Project Avista-CS24-13 — Project Summary

Queue ID
Avista-CS24-13
Capacity
95 MW
Technology
Solar
Status
active
Location
Whitman, WA
Region
West
Developer
IA Status
Cluster Study

Avista-CS24-13

Avista-CS24-13BetaActiveSolarAvistaLBNL

95 MW generation in Whitman, WA · In queue since April 2024 · Proposed COD October 2027

95 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Cluster Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 6m

Impact Study25%
Queue EntryApr 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-26

About

Avista-CS24-13 is a proposed 95 MW solar generation project located in Whitman County, Washington. The project is listed in the Avista Utilities interconnection queue with an entry date of April 30, 2024. Its proposed commercial operation date is October 26, 2027.

The project's interconnection status is currently in the Cluster Study phase. The point of interconnection is the Benewah-Thornton 230kV line. The developer is listed as Avista.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Whitman

Grid Region

Mountain West

Market

Developer

Utility

Avista Utilities

Entity

Avista

Service Type

Point of Interconnection

Benewah-Thornton 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.