Project Avista-CS24-14 — Project Summary

Queue ID
Avista-CS24-14
Capacity
40 MW
Technology
Solar
Status
active
Location
Spokane, WA
Region
West
Developer
IA Status
Cluster Study

Avista-CS24-14

Avista-CS24-14BetaActiveSolarAvistaLBNL

40 MW generation in Spokane, WA · In queue since April 2024 · Proposed COD June 2027

40 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Cluster Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 2m

Impact Study25%
Queue EntryApr 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-30

About

Avista-CS24-14 is a proposed solar generation project located in Spokane County, Washington, with a total capacity of 40 MW. The project, developed by Avista Utilities, consists of 40 MW of solar photovoltaic generation.

The project is currently in the Avista Utilities interconnection queue as of April 30, 2024, and has a proposed commercial operation date of June 30, 2027. Its interconnection status is listed as "Cluster Study," and the point of interconnection is the South Fairchild Tap 115kV.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Spokane

Grid Region

Mountain West

Market

Developer

Utility

Avista Utilities

Entity

Avista

Service Type

Point of Interconnection

South Fairchild Tap 115kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.