BHP-BHBE G15
80 MW generation in Meade, SD · In queue since May 2021 · Proposed COD January 2024
80 MW
Capacity
1
Components
Solar
5 years
In Queue
IA Executed
IA Status
COD target: 2024
Total Duration
2y 8m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2024-01-11
The proposed BHP-BHBE G15 project is an 80 MW solar generation facility located in Meade County, South Dakota. The project is being developed by BHP and is interconnected with Black Hills Power. It entered the transmission interconnection queue on May 11, 2021, with a proposed commercial operation date of January 11, 2024. The interconnection agreement for the project has been executed.
The project consists of 80 MW of solar photovoltaic generation. The point of interconnection is at the Lange-Lookout Tap.
Generated from interconnection queue and public data sources
State
SD
County
Meade
Grid Region
Mountain West
Market
—
Developer
—
Utility
Black Hills Power
Entity
BHP
Service Type
—
Point of Interconnection
Lange-Lookout Tap
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BHP-BHBE G15