BPA-G0294
250 MW generation in Columbia, WA · In queue since October 2007 · Proposed COD December 2011
250 MW
Capacity
1
Components
Wind
18y 7m
In Queue
IA Executed
IA Status
COD target: 2011
Total Duration
4y 2m
Schedule
175 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2011-12-31
BPA-G0294 is a proposed wind generation project with a total capacity of 250 MW, located in Columbia County, Washington. The project is listed in the Bonneville Power Administration (BPA) interconnection queue, with an original queue entry date of October 25, 2007. The proposed commercial operation date was December 31, 2011.
The interconnection agreement (IA) for BPA-G0294 has been executed. The point of interconnection (POI) for the project is the Central Ferry Substation.
Generated from interconnection queue and public data sources
State
WA
County
Columbia
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Central Ferry Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0294