Project BPA-G0478 — Project Summary

Queue ID
BPA-G0478
Capacity
500 MW
Technology
Solar+Battery
Status
active
Location
Morrow, OR
Region
West
Developer
IA Status
Facility Study

BPA-G0478

BPA-G0478BetaActiveSolarBatteryBPALBNL

500 MW hybrid in Morrow, OR · In queue since September 2012 · Proposed COD November 2016

500 MW

Capacity

2

Components

Solar + Battery

13y 8m

In Queue

Facility Study

IA Status

COD target: 2016

Interconnection

Total Duration

4y 2m

Schedule

116 months past proposed COD

Facilities Study50%
Queue EntrySep 6, 2012

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2016-11-01

Technology
Solar300 MW · 60%
Battery200 MW · 40%
About

The proposed BPA-G0478 project is a 500 MW hybrid solar and battery energy storage development in Morrow County, Oregon. The project consists of a 300 MW solar array coupled with a 200 MW battery energy storage system. It is located in the Bonneville Power Administration (BPA) service area within the Western interconnection region.

The project is currently in the BPA interconnection queue with an entry date of September 6, 2012 and a proposed commercial operation date of November 1, 2016. Its interconnection status is listed as "Facility Study". The point of interconnection (POI) is BPA's proposed Longhorn 500/230 kV Substation.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Morrow

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

BPA's proposed Longhorn 500/230 kV Substation.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.