Project BPA-G0490 — Project Summary

Queue ID
BPA-G0490
Capacity
345 MW
Technology
Hydro
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
Facility Study

BPA-G0490

BPA-G0490BetaActiveHydroBPALBNL

345 MW generation in Douglas, WA · In queue since July 2013 · Proposed COD January 2022

345 MW

Capacity

1

Components

Hydro

12y 10m

In Queue

Facility Study

IA Status

COD target: 2022

Interconnection

Total Duration

8y 6m

Schedule

53 months past proposed COD

Facilities Study50%
Queue EntryJul 5, 2013

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-01-02

About

BPA-G0490 is a proposed hydroelectric generation project with a total capacity of 345 MW. The project is located in Douglas County, Washington, within the Bonneville Power Administration (BPA) service area. It entered the BPA interconnection queue on July 5, 2013, and has a proposed commercial operation date of January 2, 2022. The project's interconnection status is currently in the Facility Study phase.

The development project consists of a single 345 MW hydroelectric component. It is listed in the West region interconnection queue managed by BPA.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.