BPA-G0505
20 MW generation in Lincoln, OR · In queue since January 2015 · Proposed COD January 2017
20 MW
Capacity
1
Components
Wave
11y 4m
In Queue
Facility Study
IA Status
COD target: 2017
Total Duration
2 years
Schedule
114 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2017-01-01
The proposed BPA-G0505 project is a 20 MW wave energy generation project located in Lincoln County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of January 12, 2015. Its proposed commercial operation date is January 1, 2017. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) is located on the 12.47 kV distribution line between SS162 Seal Rock and SS163 Lundy, approximately 2.5 miles south of Seal Rock.
Generated from interconnection queue and public data sources
State
OR
County
Lincoln
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Located on the 12.47 kV distribution line between SS162 Seal Rock and SS163 Lundy, approximately 2.5 miles south of Seal Rock.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0505