Project BPA-G0594 — Project Summary

Queue ID
BPA-G0594
Capacity
1 MW
Technology
Solar
Status
active
Location
Lane, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0594

BPA-G0594BetaActiveSolarBPALBNL

1 MW generation in Lane, OR · In queue since July 2018 · Proposed COD September 2018

1 MW

Capacity

1

Components

Solar

7y 10m

In Queue

In Progress (unknown study)

IA Status

COD target: 2018

Interconnection

Total Duration

2 months

Schedule

93 months past proposed COD

In Study38%
Queue EntryJul 18, 2018

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2018-09-21

About

BPA-G0594 is a proposed 1 MW solar generation project located in Lane County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of July 18, 2018. The proposed commercial operation date is September 21, 2018.

The interconnection agreement (IA) status for BPA-G0594 is listed as "In Progress (unknown study)". The point of interconnection (POI) is with EWEB's system, with the exact location to be determined.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Lane

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

EWEB's system. Exact location TBD.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0594