BPA-G0602
170 MW generation in Grant, WA · In queue since October 2018 · Proposed COD December 2022
170 MW
Capacity
1
Components
Solar
7y 7m
In Queue
Facility Study
IA Status
COD target: 2022
Total Duration
4y 2m
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-31
The proposed BPA-G0602 project is a 170 MW solar generation facility located in Grant County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of October 17, 2018. Its proposed commercial operation date is December 31, 2022, and its interconnection status is currently in the Facility Study phase.
The development project consists of 170 MW of solar photovoltaic generation. The point of interconnection is the Vantage Substation 230 kV.
Generated from interconnection queue and public data sources
State
WA
County
Grant
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Vantage Substation 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.