Project BPA-G0602 — Project Summary

Queue ID
BPA-G0602
Capacity
170 MW
Technology
Solar
Status
active
Location
Grant, WA
Region
West
Developer
IA Status
Facility Study

BPA-G0602

BPA-G0602BetaActiveSolarBPALBNL

170 MW generation in Grant, WA · In queue since October 2018 · Proposed COD December 2022

170 MW

Capacity

1

Components

Solar

7y 7m

In Queue

Facility Study

IA Status

COD target: 2022

Interconnection

Total Duration

4y 2m

Schedule

41 months past proposed COD

Facilities Study50%
Queue EntryOct 17, 2018

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-12-31

About

The proposed BPA-G0602 project is a 170 MW solar generation facility located in Grant County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of October 17, 2018. Its proposed commercial operation date is December 31, 2022, and its interconnection status is currently in the Facility Study phase.

The development project consists of 170 MW of solar photovoltaic generation. The point of interconnection is the Vantage Substation 230 kV.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Grant

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Vantage Substation 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0602