BPA-G0619
500 MW generation in Wasco, OR · In queue since April 2019 · Proposed COD December 2023
500 MW
Capacity
1
Components
Wind
7y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
4y 8m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
BPA-G0619 is a proposed 500 MW wind generation project located in Wasco County, Oregon. The project, which consists of 500 MW of wind capacity, is in the Bonneville Power Administration (BPA) interconnection queue. It entered the queue on April 10, 2019, with a proposed commercial operation date of December 31, 2023.
The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is primarily the Slatt to John Day 500 kV transmission line, with an alternate POI at the Diamond Butte Substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
OR
County
Wasco
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Primary: Slatt to John Day 500 kV transmission line. Alternate: Diamond Butte Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0619