Project BPA-G0626 — Project Summary

Queue ID
BPA-G0626
Capacity
90 MW
Technology
Solar
Status
active
Location
Grant, WA
Region
West
Developer
IA Status
Facility Study

BPA-G0626

BPA-G0626BetaActiveSolarBPALBNL

90 MW generation in Grant, WA · In queue since June 2019 · Proposed COD December 2022

90 MW

Capacity

1

Components

Solar

6y 11m

In Queue

Facility Study

IA Status

COD target: 2022

Interconnection

Total Duration

3y 6m

Schedule

41 months past proposed COD

Facilities Study50%
Queue EntryJun 27, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-12-31

About

The proposed BPA-G0626 project is a 90 MW solar generation facility located in Grant County, Washington. Interconnection is being managed through the Bonneville Power Administration (BPA) queue, with an entry date of June 27, 2019. The project's proposed commercial operation date is December 31, 2022, and its interconnection agreement status is currently in the Facility Study phase.

The project consists of 90 MW of solar photovoltaic generation. The point of interconnection is the Vantage Substation at 230 kV.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Grant

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Vantage Substation 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0626