BPA-G0639
200 MW generation in Douglas, WA · In queue since February 2020 · Proposed COD August 2023
200 MW
Capacity
1
Components
Solar
6y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
3y 6m
Schedule
34 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-08-01
BPA-G0639 is a proposed solar generation project with a total capacity of 200 MW. The project is located in Douglas County, Washington, and is interconnected to Bonneville Power Administration's (BPA) Rocky Reach - Columbia 230 kV line.
The project is listed in the BPA interconnection queue as entry G0639, with a queue entry date of February 3, 2020. The proposed commercial operation date is August 1, 2023, and the interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
WA
County
Douglas
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
BPA's Rocky Reach - Columbia 230 kV line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0639